alphen nieuw 1

INFRA - Bijzondere middenpijler brug Alphen eindelijk zichtbaar

Met het weghalen van de bekisting is de middenpijler met z'n trompetvormige kop eindelijk zichtbaar.

Concrete

With the taking away of the form work is the middle pillar with its trompet-shaped head visible again. The building of it was because its unusual shape a bit of a challenge concerning the formwork, reinforcement and concrete pouring. The more beautiful it is to see the final result.

alphen nieuw 1

bridge towards the ferry between Alpen and Lith

The specialists civil concrete construction of Den Ouden Infra realise a bridge towards the ferry between Alphen and Lith. Meanwhile have also been beams placed that connect the abbutments and the middle pillar all together. Our expectation is that we will finish the project admist March. 

 

Working in the tidal area has challeging circumstances. The area has been flooded with water before, causing us having to make a flexible planning 

 

 

  • Nederlands
  • English
  • Deutsch
  • Francais